PV stadium vs Alabama St stadium


Status
Not open for further replies.
It's hard to tell. Bama State has always recruited as well as any other FCS program. Facilities are great for morale and it raises the ceiling for the student athletes that are there, but it doesn't stop a 4-star recruit from signing with an SEC program and going Bama State or PVAM. Yeah, you may steal some from Troy, UAB, Tulane etc., but some FCS programs are doing that already with what they already have.
I believe barlow was able to steal some guys as you said, but he couldn't shake the apr and couldn't win enough
 
Bama State stadium is much nicer than PVs.... Im not impressed with PV stadium... but very impressed with things such as locker room, field house, etc. The whole upper levels of PVs stadium turns me off. I HATE all bleachers where your butt and feet are both on bleachers. The all bleacher upper level give me a high school feel. If they would have made the upper level like the concrete lower level, I personally would like it better. But the locker rooms are tit for tat with Bama State.
 



I don't want to compare the stadiums. Both are nice. I just think for PV, those upper bleachers will be easier/cheaper to tear down or remove when it is time to expand.
Someone is smarter than most ^^^^^^^ . Kudos. Precisely. The upper deck is removable for part II expansion to 30K seats. The big picture is hard to see when the view is quite narrow and limited :D .
 
I highly doubt that's the reason tho lol Where is the photo with the completed expansion

Duh. I highly doubt your highly doubt. Do your own lazy research and google or one of my more patient and caring alums can post it for you smh. Pitiful.
 
I highly doubt that's the reason tho lol Where is the photo with the completed expansion
Double the height of the shorter upper deck and close in the side where the scoreboard is. It would be harder to extend that upper deck if it were concrete. That's probably why the upper deck expansions in the Cotton Bowl are aluminum.

Anyway just let the stadium get finished. As Storm96 said we are overjoyed with our facilities. I've always admired ASU's stadium design as well. I think they have something that gives a massive feeling. I think we have something that makes any seat in the house a great seat. And we haven't even seen the finished exterior which if it matches the mockups will be very impressive. The whole SWAC wins here so let's leave it at that for now.
 
I'll bet ol' boy didn't notice that giant breeze-way between the east side stands & the entering tunnel :D lol. And he didn't notice all that real-estate on the south end of the stadium. All that space for...as is. Duh.

The university is also trying to raise $25 million in donations over the next five years to double Panther Stadium’s capacity to 30,000 seats.

me-> lol
 
Last edited:
Pit us against each other at all cost. One of the stupidest threads..... Damn. For decades we have been playing in one of the worst stadiums on Planet Earth. Hell the doors haven't even been opened for the new one, and already we are now in a pissing match of which is better than a fellow SWAC School. The answer is simple: A State's is prime design! PVAMU stellar overhaul of facilities. But both are BETTER than BLACKSHEAR!

#CloseThisThread
 
Let's be real... We all know it takes HBCUs 40 years to get to Phase 2 of an athletic project. After PVs first 2 home games, the admin will see there is no need to build a 30k facility.
 
Let's be real... We all know it takes HBCUs 40 years to get to Phase 2 of an athletic project. After PVs first 2 home games, the admin will see there is no need to build a 30k facility.


LMAO these mofos acting like they gonna have a demand for 30K that's the funny thing..... & still lmao at panthro saying that shat is state of the art with them aluminum azz seats. It's a high school stadium period, now the end zone complex is nice but that stadium is exactly like Madison Central HS stadium
 
Google has to be broken lol. Internet has to be down lol. Computer 101 must not be offered in pre-K over there. There is nothing to be gained by proving anything here. But one thing is certain, we will baboon stomp the ape shat out of your monkey football team. Save this response.

lol Enjoy your views. :D
 
Last edited:



Let's be real... We all know it takes HBCUs 40 years to get to Phase 2 of an athletic project. After PVs first 2 home games, the admin will see there is no need to build a 30k facility.

Actually we have already started items in all of our Phase's of our Athletic Project. Eight out of the Fifteen Projects have been completed or is due to be completed by the end of this year.

PHASE I
• 15,000 Seat Football Complex
• Athletic Department Facility
• Nicks Arena Upgrades

• Basketball/Volleyball Practice Facility

PHASE II
• Football Practice Fields
• Soccer
• Track & Field

• Baseball and Softball Complex
• Intramural Co-EdSoftball Field
• Intramural/Recreational Soccer/Flag Football Field
• Nicks Arena Upgrades
• Soccer Practice Fields

PHASE III
• 12-Court Tennis Complex
• Football Stadium Expansion to 30,000 Seats
• Ten-lane Bowling Alley and Retail Center

Construction Phase to be completed 2016
Project Completed
 
Google has to be broken lol. Internet has to be down lol. Computer 101 must not be offered in pre-K over there. There is nothing to be gained by proving anything here. But one thing is certain, we will baboon stomp the ape shat out of your monkey football team. Save this response.

lol Enjoy your views. :D

All that fear in that post lol We are going to kick yall azz to sleep like we always do
 
All that fear in that post lol We are going to kick yall azz to sleep like we always do

They gonna be doing this in the 3rd Qtr just like in 2014