Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
JSU just doesn't have the fan support for a 50,000 seat stadium. Take a look at Alabama State's stadium and go from there.
JSU just doesn't have the fan support for a 50,000 seat stadium. Take a look at Alabama State's stadium and go from there.
Yeah try to copy us because I don't see that dome stadium happening for y'all
The stadium we have now is better than yours. I'm in NO hurry to leave Memorial. I don't see the point in leaving. We don't pay for schitt over there and there is NOTHING wrong with the stadium. The only problem with it is that it is too big for us but so is a 50K seat dome.
That's a valid question.I want to know why alabama state's 27k seat stadium cost 62 million and a 35k stadium for jsu would be between 250 - 280 million?
I want to know why alabama state's 27k seat stadium cost 62 million and a 35k stadium for jsu would be between 250 - 280 million? bama state could have 4 27k stadiums for what jsu is paying. have interest rates gone up that much in the interim?
Let JSU end up getting a 35-40K seat open air stadium. I promise you within a year or two they will build something similar in Madison County
That's a valid question.
For what purpose??? What will be its use???
Understood. The way the story is written, I mistook the cost mentioned to be the cost of an open air stadiumEngineering and construction of a stadium with a roof compared to open-air costs significantly more.
That MAY be true, but they are robbing your azz blind.
The idea behind a dome on either the school's campus or directly adjacent to it is for it to serve as more than just a football stadium. The study, done by national consulting firm B&D Venues, would have to host other events that included conference championship games, concerts, meetings, corporate events and banquets.
To reach the projected $400,000 operating deficit, B&D estimated the dome would have to generate a minimum of 63 ticketed events with a combined attendance of at least 343,000. The primary revenue stream would be JSU's annual $1.6 million lease payment.
http://www.clarionledger.com/story/news/2014/09/25/public-money-needed-proposed-jsu-dome/16243675/
WHY WOULD JSU PAY A LEASING FEE ON SOMETHING THAT SHOULD BELONG SOLELY TO THEM??
Engineering and construction of a stadium with a roof compared to open-air costs significantly more. The HVAC system would have to be much more extensive, and I'd imagine there would be more extensive electrical and audio systems as well, not to mention the structure itself.
THEY are not in control of the stadium. If anyone is robbing JSU blind, it's JSU. We run the stadium.
The stadium we have now is better than yours.